Chinese/ English
Service hotline:

+86-22-6093-0511

Home > Technical support > Imported high-voltage power supply maintenance

Imported high-voltage power supply maintenance
Date:2021-03-01 16:28:14 Click:
 
Vacuum coating equipment, transmission electron microscope, vacuum melting furnace, electron beam 3D printing and other equipment imported from abroad, after a long period of operation, the equipment power supply high-voltage power supply failure, maintenance or repair, there are several factors: long back and forth transportation cycle, high maintenance costs, high labor costs, production shutdown and other troubles. Technical Department in non-busy working hours, we can overhaul foreign imported high-voltage power supply, if necessary, please contact customer service.


bc games casino


 

Copyright ©2015 Tianjin Mingruichuang Technology Co., Ltd ‖ gc2020.com All Rights Reserved 津ICP备14005096号 工信部备案管理系统  技术支持:创世网络